Condo Milestone Inspections: Where Water Fits In

Florida created a milestone inspection program for condominium buildings three stories or taller in 2022, then revised it in 2023 and again in 2025. The later bills also address structural integrity reserve studies, often called SIRS. For a unit owner, the practical questions are simpler than the bill numbers: when is this building's inspection due, what did it find, and what happens when the inspector's notes include water — a failed flashing, a leaking slider, or rust at a balcony edge.

The Icon Brickell residential towers in Miami at night
Icon Brickell, a residential tower in Miami, in February 2024. It illustrates a Miami-Dade condo tower, not an inspection of this building.Photo: Periodismodepaz, CC BY 4.0, via Wikimedia Commons (cropped)

This post is a plain-language guide to those questions. It is not an engineering or legal opinion, and it does not invent deadlines beyond what the Florida Department of Financial Services summary supports.

What the bills actually established

Senate Bill 4-D, signed in May 2022, created the milestone inspection requirement for buildings three stories or more. Senate Bill 154, in 2023, revised the program. House Bill 913, in 2025, revised it again and also addresses structural integrity reserve studies and reserves. The Department of Financial Services collects those changes on its property-insurance summary page.

The exact calendar that applies to a given building — the year of the first inspection, any phase-in, and the reserve-study cycle — belongs in the association's records and in the current statute, not in a blog post that would be wrong if the legislature moves the dates again. Ask the board or the manager, in writing, for:

  • The date and report of the most recent milestone inspection, if one has been done.
  • The date the next inspection is due.
  • The most recent structural integrity reserve study, and whether water-related building elements (roof, waterproofing, windows, or similar items the study includes) are funded.
  • Any special assessment already discussed for repairs the inspection or the study identified.

Where water tends to show up in an inspection

Inspectors looking at a tower are not hired as water-damage technicians, but they often record the conditions that later become indoor leaks:

  • Failed or aging waterproofing at balconies, walkways and roof edges.
  • Corroded or stained concrete at a balcony or a railing post, which can point to long-term moisture.
  • Window and slider assemblies that no longer shed rain.
  • Roof and plaza-deck drains that are clogged or undersized for a long rain.
  • Signs of leakage into a corridor ceiling, a stack of units, or a mechanical room.

Those notes are a reason to fix the source, not a substitute for drying a unit that is already wet. If water is coming through a ceiling from the unit or the deck above, the first-hour steps in water coming from the condo above still apply. The condo leak responsibility guide walks through Florida's 718.111(11)(f) split between the association policy and the unit owner's finishes.

Questions a unit owner can ask without waiting for a crisis

  • Has the building had a milestone inspection, and can owners see the report?
  • Did the report mention water, corrosion, or failed waterproofing, and what is the repair plan?
  • Is a reserve study current, and does it include the elements that keep water out?
  • If a leak happens in my unit tomorrow, who do I call first — the front desk, a restoration provider, or both?
  • How are common-element leaks and unit-interior drying coordinated so one wet ceiling is not dried while the deck above is left alone?

If the report is long or technical, ask the association for a plain-language summary of the water-related items and the proposed timeline, and keep a copy with your own photos of any stains in your unit. An inspection every several years is not a substitute for reporting a new drip when it starts.

A reserve study and an inspection report are planning documents. They do not replace a flood policy for a ground-floor unit, and they do not replace ordinary maintenance of sliders and tracks, which wind-driven rain through sliders covers in more detail.

For the work inside a wet unit, see condo water damage. For towers on the barrier island, the Miami Beach area page covers local flood and building notes.

This site is an independent referral service. If you send a request, one local provider may contact you about your unit.

FAQs

Which buildings need a milestone inspection?

The program created by SB 4-D applies to condominium buildings three stories or taller, as later revised by SB 154 and HB 913. Confirm your building's height, use, and due date with the association and the current statute.

What is a structural integrity reserve study?

It is a reserve study, addressed in the later legislation including HB 913, that looks at major structural and related building elements and at whether money is being set aside for them. Ask the association for the latest study rather than relying on a hallway rumor.

If an inspection finds a leak, who pays to dry my unit?

The 718.111(11)(f) split still applies: the association policy generally covers original building elements, and you are usually responsible for finishes inside the unit. Notice the association and your own insurer, and keep photos.

Can I hire a restoration company during an inspection period?

You can usually arrange drying inside your own unit. Work on common elements typically needs the association. Ask the manager before anyone cuts into a shared ceiling or a balcony deck.